EskildS
Second Officer
Flight distance : 111650 ft
Norway
Offline
|
The first thing you see is at the end of the pipe, 2,5 km down the valley. Here all the water comes through a pipe and into the turbine room which is being built at the start of the video. Here is where the electricity will be produced. You can the see the up the valley and the path where the tube is (under the ground).
The concrete wall in the river is the intake dam. Here is where water will be lead into the waterpipe and go down the pipe 2,5 km down the valley to the turbine room.
The dam has adjustment for minimum water flow, so the river always have water running in it. |
|