HedgeTrimmer
Second Officer
United States
Offline
|
one of the main reasons I bought my Mavic Pro is to document the build
Before they start putting on sheetrock or paneling. Take detailed pictures with reference points to show where Electrical Wiring, Water Lines, Gas Lines, Waste Lines, Cable, Phone Wiring, Ethernet cabling, Alarm system wiring, and Air duct vents are located. Put a large easy to read tape measure in picture to help with locating the aforementioned.
If there are any unusual studding, not on 16-inch centers, doubled up, or boxed in; document those too.
Having had to add Ethernet wiring, Phone lines, and Satellite Cabling, along with Alarm system wiring to two existing homes, I would have paid good money to know where several things ran, and to know about some strange placement of studs, and in one case three studs side by side.
Speaking of wiring, now is time to seriously consider running Ethernet and Alarm system wires. Yes you can go wireless with both. However Security cameras need power and decent Security panels need power.
Before you put in your yard. I would bury a couple of capped 1-1/2" dia PVC pipes going under sidewalks and drive way. Makes adding sprinkler system, low-voltage lighting, and outside security cameras a whole lot easier.
|
|