BR Solos Eng
lvl.1
Brazil
Offline
|
Hello friends.
I would like your help to solve a problem.
My DRTK-2 base records .DAT files in smaller files, the first one until the next full hour and the following in one-hour files or until it is turned off.
However, in my country BRAZIL we use a system that requires that all projects be prepared in a coordinate of a date converted in the past to make the coordinates of all projects compatible (2000.04), but for this I need to process the base point by PPP, and this point must be collected for no less than 4 hours according to the manuals that dictate the guidelines in my country. This forces me to merge all the smaller files until they complete 4 hours of recording, and then this file is transformed into RINEX to be sent for PPP processing by IBGE (Agency responsible for regulating topographical surveys).
Today I work with a workflow I developed, which requires complex data manipulation and file extension transformations to make this possible, but this process requires a lot of work and makes errors possible.
I would like to know if there is any way to merge the raw files taken from the base formed .DAT or .RTCM3 automatically or even change some configuration in the base so that it records continuous, undivided files.
Thanks
|
|